Fridays, 9PM COCO meet.
#51
#53
hmmm i had power tools when i did mine, best time was about 1 hour for just the fronts from jack up to jack down. i have spring compressors we can use...first time i did it i did it without and the second time i just got too pissed off and got me spring compressors. taking it slow, everything should take about 3-4 hours? or even more with just hand tools. no power tool is good though...i got too trigger happy and stripped bolts -,.-
Last edited by jinorazi; 07-29-2008 at 02:09 PM.
#59
Registered User
iTrader: (21)
hey ken, u get those swifts??
im down to go wherever this install is goin down...ive done plenty of springs but wouldnt mind seeing what i need ahead of time for the suby...my boy is bringin me sti springs next week from portland. so i get to go to BAIC with my awesome wheelgap but will be dropped soon enough.
hey jinorazi...what drop setup are u on?
im down to go wherever this install is goin down...ive done plenty of springs but wouldnt mind seeing what i need ahead of time for the suby...my boy is bringin me sti springs next week from portland. so i get to go to BAIC with my awesome wheelgap but will be dropped soon enough.
hey jinorazi...what drop setup are u on?